Layout Design And Assembly Line Balancing For Garments Industries

Layout Design And Assembly Line Balancing For Garments Industries
Layout Design For Garments Industries
Layout is one of the key decisions that determine the long-run efficiency of operations.Layout has numerous strategic implications because it establishes an organization’s competitive priorities in regard to the capacity, processes, flexibility and cost as well as quality of work life, customer contact and image. An effective layout can help an organization to achieve a strategy that supports differentiation, low cost, or response (Heizer et al., 2000, p. 336). The layout must consider how to achieve the following:

1. Higher utilization of space, equipment, and people.

2. Improved flow of information, material or people.

3. Improved employee morale and safer working conditions.

4. Improved customer/client interaction.

5. Flexibility (whatever the layout is now, it will need to change).

Types of Layout

Layout decision includes the best placement of machines (in production settings), offices and desks (in office settings) or service center (in setting such as hospitals or department stores). An effective layout facilitates the flow of materials, people, and information within and between areas. There are various kinds of layouts. Some of them are as follows (Heizer et al., 2000, p. 336-337).

1. Fixed Position layout – addresses the layout requirements of large, bulky projects such as ships and buildings (concerns the movement of material to the limited storage areas around the site).

2. Process Oriented Layout – deals with low volume, high variety production (also called ‘job shop’, or intermittent production). It can manage varied material flow for each product.

3. Office Layout – fixes workers positions, their equipment, and spaces (offices) to provide for movement of information (locate workers requiring frequent contact close to one another).

4. Retail Layout – allocates shelf space and responds to customer behavior (expose customer to high margin items).

5. Warehouse Layout – it addresses tradeoffs between space and material handlings (balance low cost storage with low cost material handling).
6. Product oriented layouts – seeks the best personnel and machine utilization in repetitive or continuous production (equalize the task time at each workstation).

Assembly Line Balancing

Line balancing is usually undertaken to minimize imbalance between machines or personnel while meeting a required output from the line. The production rate is indicated as cycle time to produce one unit of the product, the optimum utilization of work force depends on the basis of output norms. The actual output of the individual may be different from the output norms. The time to operate the system, hence, keeps varying. It is, therefore, necessary to group certain activities to workstations to the tune of maximum of cycle time at each work station. The assembly line needs to balance so that there is minimum waiting of the line due to different operation time at each workstation. The sequencing is therefore, not only the allocation of men and machines to operating activities, but also the optimal utilization of facilities by the proper balancing of the assembly line (Sharma, 2009, p. 179).

The process of assembly line balancing involves three steps (Heizer et al., 2000, p. 356- 358):

1. Take the units required (demand or production rate) per day and divide it into the productive time available per day (in minutes or seconds). This operation gives us what is called the cycle time. Namely, the maximum time that the product is available at each workstation if the production rate is to be achieved.

Cycle time = production time available per day / units required per day

2. Calculate the theoretical minimum number of workstations. This is the total task duration time (the  time it takes to make the product) divided by the cycle time. Fractions are rounded to the next higher whole number.

Minimum Number of Workstations = Σ Time for Task i / Cycle Time

Where n is the number of assembly tasks.

3. Balance the line by assigning specific assembly tasks to each workstation. An efficient balance is one that will complete the required assembly, follow the specified sequence, and keep the idle time at each work stations to a minimum.

Takt Time

 Takt is German word for a pace or beat, often linked to conductor’s baton. Takt time is a reference number that is used to help match the rate of production in a pacemaker process to the rate of sales. This can be formulated as below (Rother and Harris, 2008, p. 13).


Takt time can be defined as the rate at which customers need products i.e. the products should be produced at least equal to takt time to meet the customer demand. Takt time works better when customer demand is steady and clearly known; but if the customer demand varies on the daily basis then it is difficult to calculate the takt time as well asbalance the production facility according to varying takt time. So if the orders are varying every day the information of actual shipments (not orders) should be gathered for last few months or years and takt time for the particular product should be calculated. In this way, the production can be balanced to meet changing customer demand.

Cycle Time

Cycle time is defined as how frequently a finished product comes out of our production facility (Rother et al., 2008, p. 15). Cycle time includes all types of delays occurred while completing a job. So cycle time can be calculated by the following formula.

Total Cycle Time = processing time + set up time + waiting time + moving time +inspection time + rework time + other delays to complete the job

To meet customer demand or monitor productivity the cycle time and takt time should be balanced in parallel. The higher cycle time than takt time may result the late delivery and customer dissatisfaction whereas shorter cycle time than takt time may cause the excess inventory or excess use of resource.


To be continue.................So plz stay with us ..........

Knowledge about time studies & method studies for Industrial Engineering.

Knowledge about time studies & method studies for Industrial Engineering.
Time Studies
The classical stopwatch study, or time study, originally proposed by Federic W. Taylor in 1881, is still the most widely used time study method. The time study procedure involves the timing of a sample of worker’s performance and using it to set a standard. A trained and experienced person can establish a standard by following these eight steps (Heizer et al., 2000, p. 409-412).

1. Define the task to be studied (after methods analysis has been conducted).

2. Divide the task into precise elements (parts of a task that often takes no more than a few seconds).

3. Decide how many times to measure the task (the number of cycles of samples needed).

4. Record elemental times and rating of performance.

5. Compute the average observed cycle time. The average observed cycle time is the arithmetic mean of the times for each element measured, adjusted for unusual influence for each element :


6. Determine performance rating and then compute the normal time for each element.

Normal Time = (average observed cycle time) x (performance rating factor).

7. Add the normal times for each element to develop a total normal time for each task.

8. Compute the standard time. This adjustment to the total normal time provides allowances such as personal needs, unavoidable work delays and worker fatigue.      

Personal time allowances are often established in the range of 4% to 7% of total time, depending upon nearness to rest rooms, water fountains, and other facilities. Delay allowances are often set as a result of the actual studies of the delay that occurs. Fatigue allowances are based on our growing knowledge of human energy expenditure under various physical and environmental conditions. The major two disadvantages of this method are; first they require a trained staff of analysts and secondly the labor standards cannot be set before tasks are actually performed.

Predetermined Time Standards

Predetermined time standards divide manual work into small basic elements that already have established times (based on very large samples of workers). To estimate the time for a particular task, the time factors for each basic element of that task are added together. Developing a comprehensive system of predetermined time standards would be prohibitively expensive for any given firm. Consequently, a number of systems are commercially available. The most common predetermined time standard is methods time measurement (MTM), which is the product of the MTM association (Heizer et al., 2000 p. 415-416).

Predetermined time standards are an outgrowth of basic motions called therblings. The term "therblig" was coined by Frank Gilbreth. Therbligs include such activities as select, grasp, position, assemble, reach, hold, rest and inspect. These activities are stated in terms of time measurement units (TMUs), which are each equal to only 0.00001 hour or 0.0006 minutes. MTM values for various therbligs are specified with the help of detailed tables.

Predetermined time standards have several advantages over direct time studies. First, they may be established in laboratory environment, where the procedure will not upset actual production activities. Second, because the standard can be set before a task is actually performed, it can be used for planning. Third, no performance ratings are necessary. Fourth, unions tend to accept this method as fair means of setting standards. Finally, predetermined time standards are particularly effective in firms that do substantial numbers of studies of similar tasks.
   
Work Sampling

It is an estimate of the percentage of time that a worker spends on particular work by using random sampling of various workers. This can be conducted by the following procedures (Heizer et al., 2000, p. 416-418).
       
1. Take a preliminary sample to obtain an estimate of the parameter value (such as percent of time worker is busy).

2. Compute the sample size required.

3. Prepare a schedule for observing the worker at appropriate times. The concept of random numbers is used to provide for random observation. For example, let’s say we draw the following 5 random numbers from a table: 07, 12, 22, 25, and 49. These can then be used to create and observation schedules of 9:07 AM,

9:12, 9:22, 9:25, and 9:49 AM.

4. Observe and record worker activities.

5. Determine how workers spend their time (usually as percentage).  

To determine the number of observation required, management must decide upon the desired confidence level and accuracy. First, however, the analyst must select a preliminary value for the parameter under study. The choice is usually based on small sample of perhaps 50 observations. The following formula then gives the sample size for a desired confidence and accuracy. 

n = Z2 ∗ p &1 − p)/h2

Where, n = required sample size

z = standard normal deviate for the desired confidence level (z = 1 for 68% confidence, z = 2 for 95.45% confidence, and z = 3 for 99.73% confidence level)
      
p = estimated value of sample proportion (of time worker is observed busy or idle)
h = acceptable error level, in percent


Work sampling offers several advantages over time study methods. First, because a single observer can observe several workers simultaneously, it is less expensive. Second, observers usually do not require much training and no timing devices are needed. Third, the study can be temporarily delayed at any time with little impact on the results. Fourth, because work sampling uses instantaneous observations over a long period, the worker has little chance of affecting the study outcome. Fifth, the procedure is less intrusive and therefore less likely to generate objections. The disadvantages of work sampling are:
1. It does not divide work elements as completely as time studies.

2. It can yield biased or incorrect results if the observer does not follow random routes of travel and observation.

3. Being less intrusive, it tends to be less accurate; this is particularly true when cycle times are short.

Method Study

Method study focuses on how a task can (should) be accomplished. Whether controlling a machine or making or assembling components, how a task is done makes a difference in performance, safety, and quality. Using knowledge from ergonomics and methods analysis, methods engineers are charged with ensuring quality and quantity standards are achieved efficiently and safely. Methods analysis and related techniques are useful in office environments as well as in the factory. Methods techniques are used to analyze the following (Heizer et al., 2000, p. 394-396):

1. Movement of individuals or material. Analysis for this is performed using flow diagrams and process charts with varying amounts of detail.

2. Activity of human and machine and crew activity. Analysis for this is performed using activity charts (also known as man-machine charts and crew charts).

3. Body movement (primarily arms and hands). Analysis for this is performed using micro-motion charts.     
Labor Standards and Work Measurements

Effective operations management requires meaningful standards that can help a firm todetermine the following (Heizer et al., 2000, p. 408-420)

1. Amount of labor contribution for any product (the labor cost).

2. Staffing needs (how many people it will take to meet required production).

3. Cost and time estimates prior to production (to assist in a variety of decisions, from cost estimates to make or buy decisions).

4. Crew size and work balance (who does what in a group activity or on anassembly line).

5. Expected production (so that both manager and worker know what constitutes afair day’s work).

6. Basis of wage-incentive plan (what provides a reasonable incentive).

7. Efficiency of employees and supervision (a standard is necessary against which to determine efficiency).

Properly set labor standards represent the amount of time that it should take an average employee to perform specific job activities under normal working conditions. The labor standards are set in by historical experience, time studies, predetermined time standards and work sampling.
      
Historical Experience

Labor standards can be estimated based on historical experience i.e. how many labor hours were used to do a similar task when it was done last time. Based upon this experience the new time will be fixed for any new operation or works. Historical standards have the advantage of being relatively easy and inexpensive to obtain. They are usually available from employee time cards or production records. However, they are not objective, and we do not know their accuracy, whether they represent a reasonable or poor work pace, and whether unusual occurrences are included. Because their variables are unknown, their use is not recommended. Instead, time studies, predetermined time standards and work sampling are preferred (Heizer et al., 2000, p.409).           
           
If you like it, please don’t forget to put your valuable comments
By,
MD Shakhawat Hossain
B.sc in Textile Engineer
Executive of Marketing
Facebook : shakhawat.rasel
Skype : shrtex
E-Mail : shrtex@gmail.com

How to Calculate Garments Cost of Manufacturing (CM) | Knit Garments CM Calculation Formula

How to Calculate Garments Cost of Manufacturing (CM) | Knit Garments CM Calculation Formula
CM is the abbreviation for Cost of Manufacturing. In apparel industry CM means Manufacturing Cost of 12 pcs garments. To calculate Manufacturing Cost of 12 pcs knit garments of a specific order we must know-

1. Monthly expenditure of the factory,
2. Total running machine,
3. Machine qty to execute the layout of the specific order,
4. Daily (8 hour/day) productivity of the said order (excluding alter and reject) and
5. Dollar conversion rate (if monthly expenditure amount is other than US Dollar)

Suppose,

-Monthly Factory Expenditure is BD Taka 40,00,000

-Working days of the month=26 days

-Daily Factory Expenditure= BD Taka 153,846.2 (Monthly Factory Expenditure/working days in a month)

-Total running machine qty=125 Machine

-Daily Expenditure of 1 Machine = BD Taka 1230.769 (Daily Factory Expenditure/Total running machine)

-Machine qty for the layout (for the said order)=30

-Daily cost for the layout= BD Taka 36923.08 (Daily Expenditure of 1 Machine x Machine qty for the layout)

-Hourly production of the layout=120pcs

-Normal daily working hour=8hours

-Daily Production of the layout=960 pcs (Hourly production of the layout x Normal daily working hour)

-Manufacturing cost of 1pc=BD Taka 38.46154(Daily cost for the layout / Daily Production of the layout)

-So, CM (Manufacturing Cost of 12 pcs garments)= BD Taka 461.5385 (Manufacturing cost of 1pc x 12)

-Dollar conversion rate: BD Taka 78=US$1

-So, CM (Manufacturing Cost of 12 pcs garments) in US$= US$ 6.24

-20% profit could be added with CM= US$1.24

-Final CM = US$7.484 (US$6.24+ US$1.24)

What Is BOTTLENECK In Garments? How To Find Out & Reducing BOTTLENECK?

What Is BOTTLENECK In Garments? How To Find Out & Reducing BOTTLENECK?
Bottleneck
The upper narrow portion of a bottle is called neck (opening side) that is an obstruction to go to the way from large portion of bottle through narrow portion of neck. It is a metaphorical scene of obstruction of production sector. It is an extreme point in a production sector where production is hampered from normal flow of production. In a production sector bottleneck means lost production and lost profit e.g. the lowest capacity of production.

Bottleneck in production line
The lowest output point in production line is called bottleneck. The bottleneck area is where supply gathered and production goes under capacity. In the chain working systems the supply of an operator is the feeding of next operator. So, the minimum supply from bottleneck point will be the feeding of next operator as well as the production will not be more than the output of bottleneck point.


How the bottleneck may arise in the garments production sewing line/sector

1. Bottleneck before input in line/group
  • Unavailable issue from MCD/ store
  • Delay issue from source
  • Inconsistency /mistake of sequence of issue
  • Inconsistency /mistake of bundling
  • Wrong issue supply
  • Pattern problem
  • Material problem
  • Unavailable machine. Etc.
2. Bottleneck in line/group
  • Operators selection wrong
  • Task selection wrong
  • Task allocation wrong
  • Wrong works flow/sequence of works
  • Wrong measurement of task
  • Works negligence by operator
  • Operators absenteeism
  • Machine disturbs / problem
  • Lack of supply
  • Non-serial supply from operators
  • Color shading
  • Quality problem
  • Sickness of related operator
How To Find Out Bottleneck?

Bottleneck is the extreme point of line where the output / capacity of production is minimum however it is difficult to find out very quickly where a lot of operators are working together. In this situation we may consider the below factors to find out the bottleneck easily-

*By performing cycle check
It is very easy and accurate measuring system as well as the best of scientific way to find out the bottleneck at a glance from graph that is made from the data of cycle check. The extreme point of observation time that takes an operator to perform his/her task is the bottleneck point which is placed above the HPT line even though BPT line.

*By checking counter machine
It is easy to find out the bottleneck point by checking counting machine where the production has counted poor /lowest. This system may be done time to time like hourly or within an expected time.

*By observing the gathering of supply
Those point or area is the bottleneck point or area where a pile of supply is observed. Some of operators have a pile of feed but next or side of operator may get relax and it will be treated as bottleneck point or area.

*By observing serial number of supplied issue
Generally all operators perform their task as per sequence /serial number of process and if it is found in anywhere that, someone or some of operators are working the lowest serial number of running issue which is not reasonable deference with other operator, then it will be defined bottleneck point. 

Reducing bottleneck
  • Arranging pre-production meeting in time
  • Production costing
  • Layout making before input in line
  • Submitting the layout sheet to maintenance department in time
  • Checking the fabrics & accessories before issue in the line
  • Checking the pattern before issue in line
  • Select right operator for right task
  • Allocation the task as per standard produced value equally
  • Reducing excess task from overloaded operator / find capacity where else
  • Reducing ineffective time / task by production study
  • Setting up good method instead of bad method by method analyzing
  • Maintain sequence of task accordingly
  • Keeping the supply available in time
  • Should not forward the reject products
  • Supply should be forwarded after checking
  • Should not be forwarded inconsistency process
  • Should not be forwarded quality fault product
Writing By,
Nurul Amin Jibon
IE Executive (Mohammadi Group)
B.Sc In Textile Engineer
Primeasia University. Batch: 091
Phone No : 01687-201045

What are Allowances & Different types of allowances which are used in garments industries?

What are Allowances & Different types of allowances which are used in garments industries?
Allowance:
The normal time for an operation does not contain any allowances for the worker. It is impossible to work throughout the day even though the most practicable, effective method has been developed. Even under the best working method situation, the job will still demand the expenditure of human effort and some allowance must therefore be made for recovery from fatigue and for relaxation.

Allowances must also be made to enable the worker to attend to his personal needs. The allowances are categorized as:

1. Relaxation Allowance: 
Relaxation allowance may be of two types:

Personal needs allowance- this is for attending personal needs like drinking water, smoking, going to wash room etc. A common personal allowance is about 5% of basic time.

Fatigue allowance- this allowance is given to compensate for energy expended during working.  Fatigue allowance is generally considered as 4% of basic time.

2. Process allowance:
 A process allowance is an allowance of time given to compensate for enforced idleness of an operator due to the character of the process or operation on which he or she is employed.  For example- an operator may not be able to work because he has to wait for a machine to complete its own part or he may be the member of an unbalanced line. These are all unavoidable delay for which the operator is not responsible. Process allowances are generally considered as 5% of the basic time.

3. Policy Allowance:
This is used to calculate payments only in order to enhance the performance of the worker.

4. Special Allowances:
Contingency allowance should not exceed 5% .Such type of allowance may fall into following three categories;

Periodic activity allowances- Allowance for activities carried out at definite intervals of time. e.g., cleaning machines, resetting machines etc.

Interference allowance- This is the allowance to compensate the unavoidable loss of production due to simultaneous stoppage of one or more machines being operated by single operator.

Contingency Allowance- This is a small allowance of time given to compensate such delay as tool breakage involving removal of tool from the holder or power failures for small duration

Waste Reduction Techniques For An Garments Industries?

Waste Reduction Techniques For An Garments Industries?
Waste Reduction Techniques :
Some of the waste reduction tools include zero defects, setup time reduction, and line balancing. The goal of zero defects is to ensure that products are fault free all the way, through continuous improvement of the manufacturing process (Karlsson and Ahlstrom 1996). Human beings almost invariably will make errors. When errors are made and are not caught then defective parts will appear at the end of the process. However, if the errors can be prevented before they happen then defective parts can be avoided. One of the tools that the zero defect principle uses is Poka Yoke. Poka-Yoke, which was developed by Shingo, is an autonomous defect control system that is put on a machine that inspects all parts to make sure that there are zero defects. The goal of Poka-Yoke is to observe the defective parts at the source, detect the cause of the defect, and to avoid moving the defective part to the next workstation (Feld, 2000).

Single Minute Exchange of Die (SMED) is another technique of waste reduction.During 1950’s Ohno devised this system; and was able to reduce the die changing time from 1 day to three minutes (Womack, Jones and Ross, 1990). The basic idea of SMED is to reduce the setup time on a machine. There are two types of setups: internal and external. Internal setup activities are those that can be carried out only when the machine is stopped while external setup activities are those that can be done during machining. The idea is to move as many activities as possible from internal to external (Feld, 2000). Once all activities are identified than the next step is to try to simplify these activities (e.g. standardize setup, use fewer bolts). By reducing the setup time many benefits can be realized. First, die-changing specialists are not needed. Second, inventory can be reduced by producing small batches and more variety of product mix can be run.

Line balancing is considered a great weapon against waste, especially the wasted time of workers. The idea is to make every workstation produce the right volume of work that is sent to upstream workstations without any stoppage (Mid-America Manufacturing Technology Center Press Release, 2000). This will guarantee that each workstation is working in a synchronized manner, neither faster nor slower than other workstations.

Work Standardization: 
A very important principle of waste reduction is the standardization of work. Standardized work basically ensures that each job is organized and carried out in the same manner; irrespective of the people working on it. In this way if the work is standardized the same quality output will be received even if the worker is changed in process. At Toyota, every worker follows the same processing steps all the time. This includes the time needed to finish a job, the order of steps to follow for each job, and the parts on hand. By doing this one ensures that line balancing is achieved, unwanted work in process inventory is minimized and non value added activities are reduced. A tool that is used to standardize work is called takt time.

Value Stream mapping: 
Value Stream Mapping (VSM) is a technique that was originally developed by Toyota and then popularized by the book, Learning to See (The Lean Enterprise Institute, 1998), by Rother and Shook. VSM is used to find waste in the value stream of a product. Once waste is identified, then it is easier to make plan to eliminate it. The purpose of VSM is process improvement at the system level. Value stream maps show the process in a normal flow format. However, in addition to the information normally found on a process flow diagram, value stream maps show the information flow necessary to plan and meet the customer’s normal demands. Other process information includes cycle times, inventories, changeover times, staffing and modes of transportation etc. VSMs can be made for the entire business process or part of it depending upon necessity. The key benefit to value stream mapping is that it focuses on the entire value stream to find system wastes and try to eliminate the pitfall (Wilson, 2009, p. 147-153). Generally, the value stream maps are of three types. Present State Value Stream Map (PSVSM) tells about the current situation, Future State Value Stream Map (FSVSM) can be obtained by removing wastes (which can be eliminated in the short time like three to six months) from PSVSM and Ideal State Value Stream Mapping (ISVSM) is obtained by removing all the wastes from the stream. The VSM is designed to be a tool for highlighting activities. In lean terminology they are called kaizen activities, for waste reduction. Once the wastes are highlighted, the purpose of a VSM is to communicate the opportunities so they may be prioritized and acted upon. Hence, the prioritization and action must follow the VSM, otherwise it is just a waste like other wastes.

Why Need Industrial Engineering (IE) for Apparel Manufacturing Industries

Why Need Industrial Engineering (IE) for Apparel Manufacturing Industries
INTRODUCTION
Due to the increasing labor wage in developed countries, the apparel manufacturing has been migrating from the high wage developed world to low wage developing countries (Bheda, Narag and Singla, 2003). Even though the labor cost is cheaper than in developed countries; due to the specific market nature of the garment industries for example: the short production life cycle, high volatility, low predictability, high level of impulse purchase, the quick market response; garment industries are facing the greatest challenges these days (Lucy Daly and Towers, 2004).
Garment industries in developing countries are more focused on sourcing of raw material and minimizing delivery cost than labor productivity because of the availability of cheap labor. Due to this, labor productivity is lower in developing countries than in the developed ones. For example, labour is very cheap in Bangladesh but the productivity is poor among other developing countries (Shahidul and Syed Shazali, 2011). Similarly, the cost of fabric is a major part of the garment so there seems to be great need for improvement in this sector. Even in developing countries the CAD and CAM system for fabric cutting has been implemented to save fabric. Now the worry is about labor productivity and making production flexible; because the fashion industry is highly volatile and if the orders are not fulfilled on time, the fear for losing business is real.

Even today, industries are getting the same or more volumes (orders), but the number of styles they have to handle has increased drastically. Earlier industries were getting bulk order so there is no need to worry; if the production line was set for the first time it would run for a month or at least a week or two. But nowadays due to small order quantities and complex designs, the garment industry has to produce multiple styles even within a day; this needs higher flexibility in volume and style change over (Shahram and Cristian, 2011).

In some cases it has been observed that, in developing countries the garment industries are run as family business lacking skilled personnel as well as capital to implement new technologies for improving productivity and flexibility. Because of this, industries have been running in a traditional way for years and are rigid to change. They are happy as long as they are sustaining their business. They don’t have much confidence and will towards innovation over old processes. Now the time has come to struggle with global market demand and niche market in garment industries if they want to run it further(Gao, Norton, Zhang and Kin-man To, 2009).
This volatility of styles can be addressed only by flexibility in manufacturing. The best way to cope with all these challenges is the implementation of lean manufacturing. This will serve our purpose of flexibility and save a lot of money by reducing production lead time, reducing the inventory, increasing productivity, training operators for multiple works, and by reducing rework.

What is Industrial Engineering ( IE )

IE is a system which is improved production & productivity make peaceful working environment through systematic & scientific management technique .

What is the difference between “Production” and “Productivity”?

What is the difference between “Production” and “Productivity”?
Production is Conversion of the resources to product which customers demand or the quantity produced within the given time.

Production = Output (Products or Services)

Productivity is the ratio and the relationship between used resources and outputs

Productivity = Output/ Input

Example 01 : A line of operators’ make 100 pieces garments in a day. By improving the line balance (better allocation of the necessary tasks between the operators which reduces waiting time), output increases to 120. This is a (120-100/100) 20% increase in production & also a 20% increase in productivity when using garments as the unit of measure.

Example 02 : Assume that the decision was taken that in order to secure future orders we agreed a price deduction with the Buyer on the above line. The original CM of $6 is reduced to $5.5, this equates to original “dollar’ output of 100x$6 = $600 becoming 100x$5.5 = $550, this equates to an increase in dollars generated of (600-550/550) 9%. I.e. when using dollars as the unit of measure we now have an increase in productivity of 9%.


In these two examples we have used different units of output, garments & dollars. If as a result of re-balancing the line we have added 3 more operators to the original 30 (that is 10% more INPUT) to eliminate a line blockage, the original 20% increase in productivity drops to 10%.

5S-Tool of Industrial Engineering At Garments Manufacturing Process

5S-Tool of Industrial Engineering At Garments Manufacturing Process
5S:
The first pillar of TPM is called 5S, which organize and cleans work place; this helps to make problems visible and attracts the attentions of everyone. Brief description of 5S elements are as follows:

Sort (Seire): The first step in making things cleaned up and organized.

Set In Order (Seiton): Organize, identify and arrange everything in a work area.

Shine (Seiso): Regular cleaning and maintenance.

Standardize (Seiketsu): Make it easy to maintain, simplify and standardize.

Sustain (Shitsukt): Maintain what has been achieved.

Also-Work areas are safe and free of hazardous or dangerous conditions.

5S Examples:

1. Sort-All unneeded tools, parts and supplies are removed from the area.

2. Set in Order-A place for everything and everything is in its place.

3. Shine-The area is cleaned as the work is performed (best) and\or there is a routine to keep the work area clean.

4. Standardize-Cleaning and identification methods are consistently applied. Departments have weekly 5S tours. Every job has duties that use Sort, Set in Order and Shine. We all have common duties to do our part to keep all areas of the plant in shape -break room, restrooms, locker area, parking lot, etc.

5. Sustain-5S is a habit and is continually improved

5S is a simple concept with powerful results. You will get additional information on 5S so that you will be well equipped. Our experience is that the more we do 5S the better the work environment becomes: cleaner, safer, more organized, the work is easier, less confusion and less stress. Use the 5S (work\home\play) -The more you use it the easier it becomes and life just gets better and better.

Total Productive Maintenance (TPM) Implementation of lean manufacturing tools

Total Productive Maintenance (TPM) Implementation of lean manufacturing tools
Traditionally operated garment industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibility of style changeover etc. These problems were addressed in this study by the implementation of lean tools like cellular manufacturing, single piece flow, work standardization, just in time production etc.


1 Total Productive Maintenance (TPM)
Machine breakdown is one of the major headaches for people related to production. The reliability of the equipment on the shop floor is very important because if any one of the machines is down the entire shop floor productivity may be nil. The tool that takes care of these sudden breakdowns and awakes maintenance as well as production workers to minimize these unplanned breakdowns is called total productive maintenance. Total Productive Maintenance (TPM) is a maintenance program, which involves a newly defined concept for maintaining plants and equipment. The goal of the TPM program is to increase production, increase employee morale and job satisfaction. (Bisen and Srivastava, 2009, p. 175)

TPM is set of tools, which when implemented in an organization as a whole gives the best utilization of machines with least disruption of production. The set of tools are called pillars of TPM and they are shortly described here and illustrated in a TPM diagram (Figure 2).

2.1 5S :

The first pillar of TPM is called 5S, which organize and cleans work place; this helps to make problems visible and attracts the attentions of everyone. Brief description of 5S elements are as follows:

Sort: The first step in making things cleaned up and organized.

Set In Order: Organize, identify and arrange everything in a work area.

Shine: Regular cleaning and maintenance.

Standardize: Make it easy to maintain, simplify and standardize.


Sustain: Maintain what has been achieved.
 FIGURE 2: TPM diagram - Pillars of TPM (Kumar, 2008, p. 217)
2.2 Autonomous maintenance

This is about the involvement of production workers in the day to day general maintenance of machines like cleaning, lubricating etc. which saves the time of skilled maintenance person at the same time the production workers are made more responsible to their machines.

2.3 Kaizen

Kaizen is for small improvements, but carried out on a continual basis and involve all people in the organization. Kaizen requires no or little investment. The principle behind is that “a very large number of small improvements are more effective in an organizational environment than a few improvements of large value.” This pillar is aimed at reducing losses in the workplace that affect our efficiencies (Kumar, 2008, p.220).

2.4 Planned maintenance

It addresses the proactive approach of maintenance activities. This involves four types of maintenance namely preventive maintenance, breakdown maintenance, corrective maintenance, and maintenance prevention.

2.5 Quality Maintenance

It is aimed towards customer delight through the highest quality and defect free manufacturing. In this system, one has to take care of parts which affect product quality and try to eliminate or modify them to give customer superior quality.

2.6 Training

Employees should be trained such that they can analyze the root cause of the problem. General know how of the problem is not sufficient rather they should be able to know why the problem is occurring and how to eliminate it. For this employee need continuous training, ultimately; the entire employee should be multi-skilled and should solve the problem in their area by themselves.

2.7 Office TPM

This tool is about increasing the efficiencies in office (administrative) activities. This tool works the problems like communication issues, data retrieval processes, management information systems, office equipment losses, up to date information about inventories etc.

2.8 Safety Health and Environment

In this area, the focus is to create a safe workplace and a surrounding area that would not be damaged by our process or procedures. This pillar will play an active role in each of the other pillars on a regular basis. Safe work environment means accident free, fire less and it should not damage the health of workers.